Solar plants in Greece lost about 20% of their revenue in 2025, and in April 2026 18.4% of renewable output was curtailed. Don't let your energy — and your profits — go to waste.
Multiply your returns with hybrid BESS solutions designed for the Greek market.
Avoid the long wait for new grid connection terms. We have a ready DC – Coupling solution for your project.
Demand stays flat while solar capacity keeps growing. Midday energy is in surplus — storage shifts it to the evening.
The Greek energy market is changing. In 2025, 6.6% of renewable output was curtailed and PV producers lost about 20% of their revenue. Without storage, PV owners see their profits shrink — while the grid is forced to reject green energy.
How the battery is connected decides how fast it can start operating. With DC coupling, the project moves ahead without waiting for the grid operator.
The battery has its own inverter and connects on the AC side. For the grid operator, it counts as new capacity at the connection point.
The existing inverter is replaced with a hybrid one, which connects both the PV array and the battery on the DC side. Grid export capacity stays the same.
We have received your message and will be in touch soon.